GOVERNMENT OF INDIA
MINISTRY OF NEW AND RENEWABLE ENERGY
RAJYA SABHA
UNSTARRED QUESTION NO-1353
ANSWERED ON-26.03.2012
(a) whether Government has fixed any target for generation of solar power under the Jawaharlal Nehru National Solar Mission (JNNSM) during the last three years; (b) if so, the details thereof; (c) the achievements made during the last three years, State-wise; (d) whether the targets have been achieved; and (e) if not, the reasons therefor?
ANSWER
THE MINISTER OF NEW AND RENEWABLE ENERGY (DR. FAROOQ ABDULLAH) (a): No, Sir. Targets have been fixed for First Phase of JNNSM (2010-13). (b): Details are attached as Annexure ‘A’. (c): The State-wise achievements made during the Phase-I of Mission are attached as Annexure ‘B’. (d): The targets of Phase-I of JNNSM are to be met by 2013. (e) Does not arise.
(a) whether Government has fixed any target for generation of solar power under the Jawaharlal Nehru National Solar Mission (JNNSM) during the last three years; (b) if so, the details thereof; (c) the achievements made during the last three years, State-wise; (d) whether the targets have been achieved; and (e) if not, the reasons therefor?
ANSWER
THE MINISTER OF NEW AND RENEWABLE ENERGY (DR. FAROOQ ABDULLAH) (a): No, Sir. Targets have been fixed for First Phase of JNNSM (2010-13). (b): Details are attached as Annexure ‘A’. (c): The State-wise achievements made during the Phase-I of Mission are attached as Annexure ‘B’. (d): The targets of Phase-I of JNNSM are to be met by 2013. (e) Does not arise.